Research Article
Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration
Table 11
Error analysis of the models.
| | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Decomposition-integration model | −2.64% | 2.46% | −0.76% | −2.50% | −0.95% | −1.38% | 1.70% | BP network | 8.42% | −7.52% | 7.15% | 11.63% | −7.61% | 5.38% | 12.72% | PSO-SVM | 4.72% | 8.02% | −3.72% | 7.27% | 7.07% | −2.92% | 8.61% |
|
|