Research Article

Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration

Table 11

Error analysis of the models.

1234567

Decomposition-integration model−2.64%2.46%−0.76%−2.50%−0.95%−1.38%1.70%
BP network8.42%−7.52%7.15%11.63%−7.61%5.38%12.72%
PSO-SVM4.72%8.02%−3.72%7.27%7.07%−2.92%8.61%