Research Article

Stochastic Optimization for Network-Constrained Power System Scheduling Problem

Table 8

Joint analysis on grid constraints and prioritized load shedding under different number of scenarios-I.

Number of scenarios = 1 Number of scenarios = 4
Without losses With lossesWithout losses With losses
Nonprioritized PrioritizedNonprioritized PrioritizedNonprioritized PrioritizedNonprioritized Prioritized

Lsw [%] [7.17, 12.64] [10.03, 14.84] [7.17, 12.87][10.02, 15.19] [7.17, 11.55] [10.03, 13.76][7.17, 11.93][10.02, 14.20]
Lsl [%] [0.41, 0.46] [0.34, 0.36] [0.40, 0.46][0.35, 0.37][0.40, 0.46] [0.34, 0.36] [0.40, 0.46][0.35, 0.37]
Lsr [%] 0 0 0 0 0 0 0 0
Ploss [%] 0 0[1.56, 1.58][1.52, 1.55]0 0 [1.55, 1.58][1.53, 1.55]