Research Article

Optimization Method of Intersection Signal Coordinated Control Based on Vehicle Actuated Model

Table 6

The simulation traffic signal timing of Guangshun North Street in Wangjing North Road.

ProgramPhase

Cycle1234Offset

Flat peak program9649132113
High peak program14072233015