Method for Determining the Maximum Allowable Capacity of Wind Farm Based on Box Set Robust Optimization
Table 2
Importance degree of grid connection point of wind farm.
Wind farm node
16
10
12
6
20
Normalized importance degree
1.000
0.935
0.806
0.694
0.511