Research Article
A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence
Table 4
Cost update of transit routes.
| OD pair | Transit route | Our cost during loading 50%/30%/20% of OD (95% quantile SST if necessary) |
| Origin 1 to destination 3 | 1 → 2 → 3 | 4.9 (5.52)/8.1 (9.216)/10.02 (11.4336) | 1 → 5 → 6 → 3 | 28.5/32.7/34.5 | 1 → 9 → 10 → 6 → 3 | 11.7/13.1/14.66 |
| Origin 1 to destination 6 | 1 → 3 → 6 | 12.9/17.7/20.58 | 1 → 5 → 6 | 8.7 (9.63)/10.8/ 11.7 (13.095) | 1 → 9 → 10 → 6 | 8.9/10.3 (11.757)/11.86 |
| Origin 1 to destination 12 | 1 → 2 → 3 → 4 → 12 | 10.9 (11.55)/17.1 (19.611)/20.82 | 1 → 9 → 10 → 6 → 3 → 4 → 12 | 27.9/34.5/39.54 | 1 → 5 → 6 → 7 → 12 | 17.7/19.8/20.7 (23.49) | 1 → 9 → 10 → 6 → 7 → 12 | 23.7/25.8/28.14 |
|
|