Research Article

Multirunway Optimization Schedule of Airport Based on Improved Genetic Algorithm by Dynamical Time Window

Table 3

The objective function value of the 6 optimization schemes.

Optimization schemes123456

Runway throughput/s10181100107210229941066
Delay cost/CNY64988.856622.559488.741369.567218.444634.6
Controller displacement2.73462.68122.38861.95392.89742.0648