Research Article

Unit-Specific Event-Based and Slot-Based Hybrid Model Framework with Hierarchical Structure for Short-Term Scheduling

Table 5

Data for example 2.

Task () Unit ()

Heating()Heater0.6670.006670100

Reaction 1()Reactor 11.3340.0266443050
()Reactor 21.3340.0166565080

Reaction 2()Reactor 11.3340.0266463050
()Reactor 21.3340.0166542080

Reaction 3()Reactor 10.6670.0133221050
()Reactor 20.6670.00832564080

Separation()Separator1.33420.006660200

in mu, in h, in h/mu, in kg, and in kg per mu of batch.