Research Article
Analytical Calculation Method for the Preliminary Analysis of Self-Anchored Suspension Bridges
Table 7
The unstressed length and coordinates of the main cable.
| Suspender number | Unstressed length (m) | Elevation of point | Suspender number | Unstressed length (m) | Elevation of point |
| 1 | 16.22 | −9.07 | 9 | 13.99 | −32.18 | 2 | 15.16 | −16.06 | 10 | 14.00 | −28.34 | 3 | 14.87 | −22.39 | 11 | 14.01 | −24.45 | 4 | 14.86 | −28.69 | 12 | 14.05 | −20.44 | 5 | 13.98 | −32.45 | 13 | 14.06 | −16.37 | 6 | 13.93 | −36.04 | 14 | 14.11 | −12.14 | 7 | 13.92 | −39.56 | 15 | 14.71 | −6.19 | 8 | 13.93 | −36.00 | 16 | 14.81 | 0 |
|
|