Research Article
Taxiing Route Scheduling between Taxiway and Runway in Hub Airport
Table 3
The specific and detailed scheduling results for aircraft taxiing in IGA.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note. In the table, the up row indicates the upstream route nodes for each aircraft going through; the down row indicates the time reaching each node. |