Research Article

A New Method Based on TOPSIS and Response Surface Method for MCDM Problems with Interval Numbers

Table 9

Decision matrix for road transport technologies.

TechnologiesGHG (A)PM10 (B) (C)CO (D)HCs (E)Cost (F)

HEV100, 400]0.001, 0.035]0.10, 0.30]0.10, 0.5]0.30, 1.10]17.55, 18.75]
Av BEV125, 300]0.035, 0.135]0.18, 0.70]0.10, 0.4]0.18, 0.60]18.0, 19.05]
Re BEV25, 80]0.005, 0.018]0.05, 0.15]0.05, 0.1]0.05, 0.15]18.8, 19.4]
LPG125, 450]0.007, 0.035]0.17, 0.37]0.50, 1.2]0.18, 0.65]19.2, 22.2]
CNG120, 420]0.010, 0.025]0.05, 0.20]0.49, 1.0]0.50, 1.50]14.8, 16.6]
Petrol125, 500]0.010, 0.035]0.10, 0.40]0.49, 1.0]0.40, 1.42]16.8, 19.2]
Diesel115, 430]0.010, 0.060]0.25, 0.62]0.20, 0.5]0.15, 0.62]12.5, 13.9]
Bioethanol80, 350]0.023, 0.120]0.38, 1.20]1.00, 3.5]0.19, 0.48]14.3, 17.0]
Biodiesel70, 300]0.005, 0.070]0.44, 1.10]0.2, 0.75]0.38, 1.20]12.5, 13.8]

Min/maxMinMinMinMinMinMin

Best25, 80]0.001, 0.035]0.05, 0.15]0.05, 0.1]0.05, 0.15]12.5, 13.8]
Worst125, 500]0.035, 0.135]0.38, 1.20]1.00, 3.5]0.50, 1.50]19.2, 22.2]