Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2015 (2015), Article ID 957970, 10 pages
http://dx.doi.org/10.1155/2015/957970
Research Article

An EPQ Model for Deteriorating Production System and Items with Rework

1Department of Industrial and Systems Engineering, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong
2Department of Applied Mathematics, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong

Received 7 December 2014; Accepted 5 February 2015

Academic Editor: Antonio Tornambe

Copyright © 2015 N. Li et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. D. Walters, Inventory Control and Management, Wiley India, New Delhi, India, 2008.
  2. F. Raafat, “Survey of literature on continuously deteriorating inventory models,” Journal of the Operational Research Society, vol. 42, no. 1, pp. 27–37, 1991. View at Publisher · View at Google Scholar · View at Scopus
  3. C. M. Hinckley, “Defining the best quality-control systems by design and inspection,” Clinical Chemistry, vol. 43, no. 5, pp. 873–879, 1997. View at Google Scholar · View at Scopus
  4. T. Worstall, “The high cost to Foxconn of returned apple iphones,” Forbes, 2013, http://www.forbes.com/sites/timworstall/2013/04/22/the-high-cost-to-foxconn-of-returned-apple-iphones/. View at Google Scholar
  5. S. M. R. Iravani and I. Duenyas, “Integrated maintenance and production control of a deteriorating production system,” IIE Transactions, vol. 34, no. 5, pp. 423–435, 2002. View at Publisher · View at Google Scholar · View at Scopus
  6. S. K. Goyal and B. C. Giri, “Recent trends in modeling of deteriorating inventory,” European Journal of Operational Research, vol. 134, no. 1, pp. 1–16, 2001. View at Publisher · View at Google Scholar · View at Scopus
  7. H.-M. Wee, “Economic production lot size model for deteriorating items with partial back-ordering,” Computers and Industrial Engineering, vol. 24, no. 3, pp. 449–458, 1993. View at Publisher · View at Google Scholar · View at Scopus
  8. H.-M. Wee and S.-T. Law, “Economic production lot size for deteriorating items taking account of the time-value of money,” Computers and Operations Research, vol. 26, no. 6, pp. 545–558, 1999. View at Publisher · View at Google Scholar · View at Scopus
  9. S. K. Goyal and A. Gunasekaran, “An integrated production-inventory-marketing model for deteriorating items,” Computers and Industrial Engineering, vol. 28, no. 4, pp. 755–762, 1995. View at Publisher · View at Google Scholar · View at Scopus
  10. S. K. Manna and K. S. Chaudhuri, “An EOQ model with ramp type demand rate, time dependent deterioration rate, unit production cost and shortages,” European Journal of Operational Research, vol. 171, no. 2, pp. 557–566, 2006. View at Publisher · View at Google Scholar · View at Scopus
  11. S. W. Chiu, K.-K. Chen, and H.-D. Lin, “Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework,” International Journal for Numerical Methods in Biomedical Engineering, vol. 27, no. 10, pp. 1545–1557, 2011. View at Publisher · View at Google Scholar · View at Scopus
  12. S. W. Chiu, Y.-S. P. Chiu, and J.-C. Yang, “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework,” Expert Systems with Applications, vol. 39, no. 3, pp. 2578–2583, 2012. View at Publisher · View at Google Scholar · View at Scopus
  13. L. E. Cardenas-Barron, B. Sarkar, and G. Trevino-Garza, “An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments,” Applied Mathematical Modelling: Simulation and Computation for Engineering and Environmental Systems, vol. 37, no. 7, pp. 5549–5554, 2013. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  14. L. E. Cárdenas-Barrón, “The economic production quantity (EPQ) with shortage derived algebraically,” International Journal of Production Economics, vol. 70, no. 3, pp. 289–292, 2001. View at Publisher · View at Google Scholar · View at Scopus
  15. Y. P. Chiu, “Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging,” Engineering Optimization, vol. 35, no. 4, pp. 427–437, 2003. View at Publisher · View at Google Scholar · View at Scopus
  16. L. E. Cárdenas-Barrón, “Economic production quantity with rework process at a single-stage manufacturing system with planned backorders,” Computers and Industrial Engineering, vol. 57, no. 3, pp. 1105–1113, 2009. View at Publisher · View at Google Scholar · View at Scopus
  17. D. W. Pentico, M. J. Drake, and C. Toews, “The deterministic EPQ with partial backordering: a new approach,” Omega, vol. 37, no. 3, pp. 624–636, 2009. View at Publisher · View at Google Scholar · View at Scopus
  18. A. Eroglu and G. Ozdemir, “An economic order quantity model with defective items and shortages,” International Journal of Production Economics, vol. 106, no. 2, pp. 544–549, 2007. View at Publisher · View at Google Scholar · View at Scopus
  19. P. L. Abad, “Optimal pricing and lot-sizing under conditions of perishability, finite production and partial backordering and lost sale,” European Journal of Operational Research, vol. 144, no. 3, pp. 677–685, 2003. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  20. B. Sarkar, “A production-inventory model with probabilistic deterioration in two-echelon supply chain management,” Applied Mathematical Modelling, vol. 37, no. 5, pp. 3138–3151, 2013. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  21. M. Khouja and A. Mehrez, “Economical production lot size model with variable production rate and imperfect quality,” The Journal of the Operational Research Society, vol. 45, no. 12, pp. 1405–1417, 1994. View at Google Scholar · View at Scopus
  22. C. H. Kim and Y. Hong, “An optimal production run length in deteriorating production processes,” International Journal of Production Economics, vol. 58, no. 2, pp. 183–189, 1999. View at Publisher · View at Google Scholar · View at Scopus
  23. G. C. Lin and D. E. Kroll, “Economic lot sizing for an imperfect production system subject to random breakdowns,” Engineering Optimization, vol. 38, no. 1, pp. 73–92, 2006. View at Publisher · View at Google Scholar · View at Scopus
  24. B. Sarkar, L. E. Cárdenas-Barrón, M. Sarkar, and M. L. Singgih, “An economic production quantity model with random defective rate, rework process and backorders for a single stage production system,” Journal of Manufacturing Systems, vol. 33, no. 3, pp. 423–435, 2014. View at Publisher · View at Google Scholar · View at Scopus
  25. Y.-S. P. Chiu and H.-H. Chang, “Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: a note,” Economic Modelling, vol. 37, pp. 143–148, 2014. View at Publisher · View at Google Scholar · View at Scopus
  26. B. Pal, S. S. Sana, and K. Chaudhuri, “A mathematical model on EPQ for stochastic demand in an imperfect production system,” Journal of Manufacturing Systems, vol. 32, no. 1, pp. 260–270, 2013. View at Publisher · View at Google Scholar
  27. R. H. Teunter and S. D. P. Flapper, “Lot-sizing for a single-stage single-product production system with rework of perishable production defectives,” OR Spectrum: Quantitative Approaches in Management, vol. 25, no. 1, pp. 85–96, 2003. View at Publisher · View at Google Scholar · View at MathSciNet
  28. K. Inderfurth, G. Lindner, and N. P. Rachaniotis, “Lot sizing in a production system with rework and product deterioration,” International Journal of Production Research, vol. 43, no. 7, pp. 1355–1374, 2005. View at Publisher · View at Google Scholar · View at Scopus
  29. A. H. Tai, “Economic production quantity models for deteriorating/imperfect products and service with rework,” Computers and Industrial Engineering, vol. 66, no. 4, pp. 879–888, 2013. View at Publisher · View at Google Scholar · View at Scopus