Research Article

Research on Francis Turbine Modeling for Large Disturbance Hydropower Station Transient Process Simulation

Table 3

Initial values for load rejection simulations.

Variable25% rated load rejection50% rated load rejection75% rated load rejection

(p.u.)1.0361.0361.036
(p.u.)0.31370.49450.6811
(p.u.)0.30810.44010.5929
(p.u.)0.24880.48920.7458