Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2015 (2015), Article ID 973291, 11 pages
http://dx.doi.org/10.1155/2015/973291
Research Article

An Adapted Firefly Algorithm for Product Development Project Scheduling with Fuzzy Activity Duration

1School of Public Administration, South China Normal University, Guangzhou 510006, China
2School of Finance, Guangdong University of Finance & Economics, Guangzhou 510320, China
3School of Computer Science, South China Normal University, Guangzhou 510631, China

Received 3 June 2014; Revised 11 August 2014; Accepted 27 August 2014

Academic Editor: Fang Zong

Copyright © 2015 Minmei Huang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. J. Wang, “A fuzzy project scheduling approach to minimize schedule risk for product development,” Fuzzy Sets and Systems, vol. 127, no. 2, pp. 99–116, 2002. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  2. S. H. Nasution, “Fuzzy critical path method,” IEEE Transactions on Systems, Man and Cybernetics, vol. 24, no. 1, pp. 48–57, 1994. View at Publisher · View at Google Scholar · View at Scopus
  3. F. A. Lootsma, “Stochastic and fuzzy Pert,” European Journal of Operational Research, vol. 43, no. 2, pp. 174–183, 1989. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at Scopus
  4. M. Hapke and R. Slowinski, “Fuzzy priority heuristics for project scheduling,” Fuzzy Sets and Systems, vol. 83, no. 3, pp. 291–299, 1996. View at Publisher · View at Google Scholar · View at Scopus
  5. T. Bhaskar, M. N. Pal, and A. K. Pal, “A heuristic method for RCPSP with fuzzy activity times,” European Journal of Operational Research, vol. 208, no. 1, pp. 57–66, 2011. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  6. J. Wang, “A fuzzy robust scheduling approach for product development projects,” European Journal of Operational Research, vol. 152, no. 1, pp. 180–194, 2004. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet · View at Scopus
  7. H. Ke and B. Liu, “Fuzzy project scheduling problem and its hybrid intelligent algorithm,” Applied Mathematical Modelling, vol. 34, no. 2, pp. 301–308, 2010. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  8. X. S. Yang, Nature-Inspired Metaheuristic Algorithms, Luniver Press, Frome, UK, 2008.
  9. X. S. Yang, “Firefly algorithm for multimodal optimization,” in Stochastic Algorithms: Foundations and Applications, vol. 5792 of Lecture Notes in Computer Science, pp. 169–178, Springer, Berlin, Germany, 2009. View at Publisher · View at Google Scholar
  10. X.-S. Yang, “Firefly algorithm, stochastic test functions and design optimization,” International Journal of Bio-Inspired Computation, vol. 2, no. 2, pp. 78–84, 2010. View at Publisher · View at Google Scholar · View at Scopus
  11. S. Łukasik and S. Zak, “Firefly algorithm for continuous constrained optimization tasks,” Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), vol. 5796, pp. 97–106, 2009. View at Publisher · View at Google Scholar · View at Scopus
  12. M. K. Sayadi, R. Ramezanian, and N. Ghaffari-Nasab, “A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems,” International Journal of Industrial Engineering Computations, vol. 1, no. 1, pp. 1–10, 2010. View at Publisher · View at Google Scholar · View at Scopus
  13. P. Sanaei, R. Akbari, V. Zeighami, and S. Shams, “Using firefly algorithm to solve resource constrained project scheduling problem,” Advances in Intelligent Systems and Computing, vol. 201, no. 1, pp. 417–428, 2013. View at Publisher · View at Google Scholar · View at Scopus
  14. M. M. Huang, J. J. Yuan, and Y. Xue, “A hybrid firefly algorithm for resource-constrained project scheduling problem,” in Proceedings of International Conference on Computer and Management (CAMMAN '12), Wuhan, China, March 2012.
  15. J.-J. Yuan, “Optimal design for scale-based product family based on multi-objective firefly algorithm,” Computer Integrated Manufacturing Systems, vol. 18, no. 8, pp. 1801–1809, 2012 (Chinese). View at Google Scholar · View at Scopus
  16. X. S. Yang, “Multiobjective firefly algorithm for continuous optimization,” Engineering with Computers, vol. 29, no. 2, pp. 175–184, 2013. View at Publisher · View at Google Scholar · View at Scopus
  17. F. Luna, D. L. González-Álvarez, F. Chicano, and M. A. Vega-Rodríguez, “The software project scheduling problem: a scalability analysis of multi-objective metaheuristics,” Applied Soft Computing Journal, vol. 15, pp. 136–148, 2014. View at Publisher · View at Google Scholar · View at Scopus
  18. D. Dubois and H. Prade, “Towards fuzzy differential calculus part 3: differentiation,” Fuzzy Sets and Systems, vol. 8, no. 3, pp. 225–233, 1982. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  19. M. Ma, M. Friedman, and A. Kandel, “A new fuzzy arithmetic,” Fuzzy Sets and Systems, vol. 108, no. 1, pp. 83–90, 1999. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  20. B. Asady and A. Zendehnam, “Ranking fuzzy numbers by distance minimization,” Applied Mathematical Modelling, vol. 31, no. 11, pp. 2589–2598, 2007. View at Publisher · View at Google Scholar · View at Scopus
  21. S. Abbasbandy and T. Hajjari, “A new approach for ranking of trapezoidal fuzzy numbers,” Computers & Mathematics with Applications, vol. 57, no. 3, pp. 413–419, 2009. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  22. R. Ezzati, T. Allahviranloo, S. Khezerloo, and M. Khezerloo, “An approach for ranking of fuzzy numbers,” Expert Systems with Applications, vol. 39, no. 1, pp. 690–695, 2012. View at Publisher · View at Google Scholar · View at Scopus
  23. R. Kolisch and A. Sprecher, “PSPLIB—a project scheduling problem library,” European Journal of Operational Research, vol. 96, no. 1, pp. 205–216, 1997. View at Publisher · View at Google Scholar · View at Scopus