Research Article

Hybrid Multistarting GA-Tabu Search Method for the Placement of BtB Converters for Korean Metropolitan Ring Grid

Figure 2

The BtB DC link in (a) can be represented as a simple power injection model as seen in (b).
(a)
(b)