Research Article
Signal Timing Optimization Based on Fuzzy Compromise Programming for Isolated Signalized Intersection
Table 3
Signal timing optimization results with high traffic flow.
|
Schemes | Parameters | | | | | | | |
| Scheme (fuzzy compromise programming method) | 1 | 0.86 | 34 | 16 | 38 | 21 | 125 | 2 | 0.55 | 32 | 15 | 37 | 20 | 120 | ∞ | 0.46 | 33 | 16 | 37 | 21 | 123 | Scheme (Webster method) | — | — | 37 | 19 | 47 | 26 | 145 | Scheme (simply weighted) | — | — | 32 | 18 | 38 | 21 | 125 | Scheme (weighted by volume) | — | — | 36 | 18 | 37 | 23 | 130 |
|
|