Research Article
Signal Timing Optimization Based on Fuzzy Compromise Programming for Isolated Signalized Intersection
Table 4
Signal timing optimization results with low traffic flow.
|
Schemes | Parameters | | | | | | | |
| Scheme (fuzzy compromise programming method) | 1 | 0.82 | 15 | 10 | 13 | 10 | 64 | 2 | 0.33 | 14 | 10 | 14 | 10 | 64 | | 0.33 | 14 | 10 | 14 | 11 | 66 | Scheme (Webster method) | — | — | 17 | 10 | 18 | 11 | 72 | Scheme (simply weighted) | — | — | 17 | 10 | 15 | 10 | 68 | Scheme (weighted by volume) | — | — | 17 | 10 | 16 | 11 | 70 |
|
|