Research Article
Signal Timing Optimization Based on Fuzzy Compromise Programming for Isolated Signalized Intersection
Table 6
Average performance comparison with low traffic flow.
| Schemes | Parameters | | Delay | Average stop | Vehicles throughput | Total stops |
| Scheme (fuzzy compromise programming method) | 1 | 31.1 | 1.1 | 4673 | 19.8 | 2 | 31.4 | 1.09 | 4669 | 20 | ∞ | 32.5 | 1.11 | 4660 | 21 | Scheme (Webster method) | — | 39.5 | 1.19 | 4622 | 23.6 | Scheme (simply weighted) | — | 35.5 | 1.13 | 4667 | 22.1 | Scheme (weighted by volume) | | 35.6 | 1.19 | 4634 | 23.4 |
|
|