Research Article

Highway Expenditures and Associated Customer Satisfaction: A Case Study

Table 17

Estimates for the expenditure trend categories.

MeanStandard deviationTrend estimateStandard error-statisticsPr(>||)

District 1
Construction396372.6670038.238794.5436156.061.07290.3014
Construction engineering7582574114953453298.1462938.550.84680.4113
Maintenance170594514659285700596.9182622.03.83630.0018
Roadway design272945.8378387.762035.8513277.794.67210.0004
Traffic9307.1055434.873504.43273.681.84300.0086

District 2
Construction227817.1481591.538108.1625042.811.52170.1503
Construction engineering3666015657684.550251.8434390.401.46120.1660
Maintenance1686008460342621117075160037.606.98000.0000
Roadway design12782.4323525.46795.511303.400.61030.5515
Traffic5903.3364331.059−331.38226.42−1.46350.1654

District 3
Construction258197.6524008.739028.2927504.341.41890.1778
Construction engineering3422544559718.722305.3930849.720.72300.4816
Maintenance148863815923932629710.9286815.42.19550.0455
Roadway design1894.3365453.910−367.89289.94−1.26880.2252
Traffic3719.8042988.365−83.82166.25−0.50410.6220

Significance codes: 0 = , 0.001 = , 0.01 = , 0.05 = #.