Research Article

A Biobjective and Trilevel Programming Model for Hub Location Problem in Design of a Resilient Power Projection Network

Table 5

Pareto solutions set for the computational example.

SolutionSelected hubsNormal cost
Worst-case cost
Increase in (%)Decrease in (%)Efficiency-cost ratioNetwork resilience

12.2581 × 1073.2656 × 1070.6914
22.2850 × 1073.2626 × 1071.20.90.750.7004
32.2972 × 1072.9126 × 1071.710.86.350.7887
42.3242 × 1072.9096 × 1072.910.93.760.7988
52.3474 × 1072.9052 × 1074.011.02.750.8080
62.3806 × 1072.9022 × 1075.411.12.060.8203