Research Article

A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness

Table 2

ANOVA for the effect of due date tightness on CPU time of the B&B algorithm.

SourcesSSDFMS value

28237.9214119.09.30.000
9393.624696.83.10.047
Interaction ()11227.542806.91.80.119
Error533384.43511519.6

Total582243.4359

Significance level = 0.05.