Research Article

Simulation-Based Optimization for Yard Design at Mega Container Terminal under Uncertainty

Table 2

The decision variables and optimal yard design schemes under various investment budgets.

NumberBudgets (MCNY/month)Decision variables⁢Yard design schemesCosts (MCNY/month)
Yard depth (m)Block length (m)# of yard cranesInvestment costOperation lossesTotal costs

151221360670124.6911.0115.70
25.51232360440245.198.8114.00
361462413210285.986.8212.80
46.51462413210285.986.8212.80
571463413210426.576.1912.76
67.51463413210426.576.1912.76