Simulation-Based Optimization for Yard Design at Mega Container Terminal under Uncertainty

Table 3

The feasible yard design schemes determined by MTPRC under various investment budgets.

Number Budgets (MCNY/month)Decision variablesYard design schemesCosts (MCNY/month)
Yard depth (m)Block length (m)# of yard cranesInvestment costOperation lossesTotal costs

15
25.51451413256145.408.7614.16
361451413256145.408.7614.16
41452413256285.986.8712.85
56.51451413256145.408.7614.16
61452413256285.986.8712.85
71651466256166.108.6514.75
81661466210166.108.5914.69
971451413256145.408.7614.16
101452413256285.986.8712.85
111453413256426.576.2412.81
121651466256166.108.6514.75
131652466256326.776.7713.54
141661466210166.108.5914.69
151662466210326.776.7113.48
161851519256186.818.5915.40
171861519210186.818.5215.33
187.51451413256145.408.7614.16
191452413256285.986.8712.85
201453413256426.576.2412.81
211454413256567.155.9313.08
221651466256166.108.6514.75
231652466256326.776.7713.54
241653466256487.446.1413.58
251661466210166.108.5914.69
261662466210326.776.7113.48
271663466210487.446.0813.52
281851519256186.818.5915.40
291861519210186.818.5215.33