Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2016, Article ID 8704750, 9 pages
http://dx.doi.org/10.1155/2016/8704750
Research Article

Heuristics for the Economic Production Quantity Problem under Restrictions on Production and Maintenance Time

1School of Medical Information Engineering, Jining Medical University, Rizhao 276826, China
2School of Management, Qufu Normal University, Rizhao 276826, China

Received 12 May 2016; Accepted 25 August 2016

Academic Editor: Inmaculada T. Castro

Copyright © 2016 Qi Xu and Jianteng Xu. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. M. K. Salameh and M. Y. Jaber, “Economic production quantity model for items with imperfect quality,” International Journal of Production Economics, vol. 64, no. 1–3, pp. 59–64, 2000. View at Publisher · View at Google Scholar · View at Scopus
  2. K.-J. Chung and Y.-F. Huang, “The optimal cycle time for EPQ inventory model under permissible delay in payments,” International Journal of Production Economics, vol. 84, no. 3, pp. 307–318, 2003. View at Publisher · View at Google Scholar · View at Scopus
  3. L. E. Cárdenas-Barrón, “Economic production quantity with rework process at a single-stage manufacturing system with planned backorders,” Computers & Industrial Engineering, vol. 57, no. 3, pp. 1105–1113, 2009. View at Publisher · View at Google Scholar · View at Scopus
  4. A. Jeang, “Economic production order quantity and quality,” International Journal of Production Research, vol. 49, no. 6, pp. 1753–1783, 2011. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at Scopus
  5. S.-D. Lee and C.-M. Yang, “An economic production quantity model with a positive resetup point under random demand,” Applied Mathematical Modelling, vol. 37, no. 5, pp. 3340–3354, 2013. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  6. J. Mezei and K.-M. Björk, “An economic production quantity problem with backorders and fuzzy cycle times,” Journal of Intelligent and Fuzzy Systems, vol. 28, no. 4, pp. 1861–1868, 2015. View at Publisher · View at Google Scholar · View at Scopus
  7. S.-D. Lee, C.-M. Yang, and S.-C. Lan, “Economic lot sizing in a production system with random demand,” International Journal of Systems Science. Principles and Applications of Systems and Integration, vol. 47, no. 5, pp. 1142–1154, 2016. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  8. H. Groenevelt, L. Pintelon, and A. Seidmann, “Production lot sizing with machine breakdowns,” Management Science, vol. 38, no. 1, pp. 104–123, 1992. View at Publisher · View at Google Scholar · View at Scopus
  9. N. E. Abboud, “A simple approximation of the EMQ model with Poisson machine failures,” Production Planning and Control, vol. 8, no. 4, pp. 385–397, 1997. View at Publisher · View at Google Scholar · View at Scopus
  10. G. C. Lin and D.-C. Gong, “On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time,” Mathematical and Computer Modelling, vol. 43, no. 7-8, pp. 920–932, 2006. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  11. S. W. Chiu, S.-L. Wang, and Y.-S. P. Chiu, “Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns,” European Journal of Operational Research, vol. 180, no. 2, pp. 664–676, 2007. View at Publisher · View at Google Scholar · View at Scopus
  12. Y.-S. P. Chiu, C.-Y. Tseng, W.-C. Liu, and C.-K. Ting, “Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy,” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, vol. 223, no. 2, pp. 183–194, 2009. View at Publisher · View at Google Scholar · View at Scopus
  13. O. Prakash, A. R. Roy, and A. Goswami, “Stochastic manufacturing system with process deterioration and machine breakdown,” International Journal of Systems Science, vol. 45, no. 12, pp. 2539–2551, 2014. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  14. P.-S. Ting and K.-J. Chung, “On the convexity for the expected total cost per unit time of the EPQ model with scrap, rework and stochastic machine breakdown,” Applied Mathematical Modelling, vol. 38, no. 7-8, pp. 2296–2301, 2014. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  15. R. D. Meller and D. S. Kim, “The impact of preventive maintenance on system cost and buffer size,” European Journal of Operational Research, vol. 95, no. 3, pp. 577–591, 1996. View at Publisher · View at Google Scholar · View at Scopus
  16. B. C. Giri and T. Dohi, “Computational aspects of an extended EMQ model with variable production rate,” Computers and Operations Research, vol. 32, no. 12, pp. 3143–3161, 2005. View at Publisher · View at Google Scholar · View at Scopus
  17. G.-L. Liao, Y. H. Chen, and S.-H. Sheu, “Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance,” European Journal of Operational Research, vol. 195, no. 2, pp. 348–357, 2009. View at Publisher · View at Google Scholar · View at Scopus
  18. G.-L. Liao and S.-H. Sheu, “Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance,” International Journal of Production Economics, vol. 130, no. 1, pp. 118–124, 2011. View at Publisher · View at Google Scholar · View at Scopus
  19. T.-H. Lee, “Optimal production run length and maintenance schedule for a deteriorating production system,” International Journal of Advanced Manufacturing Technology, vol. 43, no. 9-10, pp. 959–963, 2009. View at Publisher · View at Google Scholar · View at Scopus
  20. Y.-H. Lin, J.-M. Chen, and Y.-C. Chen, “The impact of inspection errors, imperfect maintenance and minimal repairs on an imperfect production system,” Mathematical and Computer Modelling, vol. 53, no. 9-10, pp. 1680–1691, 2011. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  21. S. S. Sana, “Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system,” International Journal of Production Research, vol. 50, no. 23, pp. 6763–6774, 2012. View at Publisher · View at Google Scholar · View at Scopus
  22. G. A. Widyadana and H. M. Wee, “An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown,” International Journal of Systems Science, vol. 43, no. 10, pp. 1870–1882, 2012. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  23. H. M. Wee and G. A. Widyadana, “Economic production quantity models for deteriorating items with rework and stochastic preventive maintenance time,” International Journal of Production Research, vol. 50, no. 11, pp. 2940–2952, 2012. View at Publisher · View at Google Scholar · View at Scopus
  24. H. M. Wee and G. A. Widyadana, “A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule,” Omega, vol. 41, no. 6, pp. 941–954, 2013. View at Publisher · View at Google Scholar · View at Scopus
  25. G.-L. Liao, “Joint production and maintenance strategy for economic production quantity model with imperfect production processes,” Journal of Intelligent Manufacturing, vol. 24, no. 6, pp. 1229–1240, 2013. View at Publisher · View at Google Scholar · View at Scopus
  26. Y.-C. Tsao, “A piecewise nonlinear optimization for a production-inventory model under maintenance, variable setup costs, and trade credits,” Annals of Operations Research, vol. 233, pp. 465–481, 2015. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet · View at Scopus
  27. S. Y. Gan, Z. S. Zhang, Y. F. Zhou, and J. F. Shi, “Joint optimization of maintenance, buffer, and spare parts for a production system,” Applied Mathematical Modelling, vol. 39, no. 19, pp. 6032–6042, 2015. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  28. B. Emami-Mehrgani, W. P. Neumann, S. Nadeau, and M. Bazrafshan, “Considering human error in optimizing production and corrective and preventive maintenance policies for manufacturing systems,” Applied Mathematical Modelling. Simulation and Computation for Engineering and Environmental Systems, vol. 40, no. 3, pp. 2056–2074, 2016. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  29. M. Nourelfath, N. Nahas, and M. Ben-Daya, “Integrated preventive maintenance and production decisions for imperfect processes,” Reliability Engineering & System Safety, vol. 148, pp. 21–31, 2016. View at Publisher · View at Google Scholar · View at Scopus
  30. R. E. Bellman, Dynamic Programming, Princeton University Press, Princeton, NJ, USA, 1957. View at MathSciNet