Abstract

This paper proposes an economic production quantity problem with the maximal production run time and minimal preventive maintenance time over a finite planning horizon. The objective is to find the efficient production and maintenance policy to minimize the total cost composed of production, maintenance, shortages, and holding costs under the restriction on the production run time and the preventive maintenance time. The production and maintenance decisions include the production and maintenance frequencies and the production run and the maintenance time. The variability and the boundedness of the production run and maintenance time make the problem difficult to solve. Two heuristic algorithms are developed using different techniques based on the optimal properties of the relaxed problem. The performance comparison between the two algorithms is illustrated by numerical examples. The numerical results show that, for the most part, there exists a heuristic algorithm which is more effective than the other.

1. Introduction

The economic production quantity (EPQ) is a fundamental inventory control problem, and it is still widely used by many industries today [1]. Some literature concentrates on the classical EPQ problem and its extensions, such as Chung and Huang [2], Cárdenas-Barrón [3], Jeang [4], Lee and Yang [5], Mezei and Björk [6], and Lee et al. [7]. In these extensions of the classical EPQ problem, one of the assumptions is that the production process is not interrupted. However, in reality, the production process is usually interrupted by some outside and inside reasons. For example, in some cities of China, such as Shanghai and Guangzhou, the restriction policy on electricity power supply is usually imposed on the manufacturing industries when the demand of the electricity power exceeds the supply. On the other hand, in some manufacturing industries, it is necessary to stop production and give the preventive maintenance (PM) or perform the corrective maintenance (CM) when the production facility breaks down. The production interruption brings new problems to the production decisions of the manufacturing industries and has received more and more attention.

The effects of machine breakdown and CM (or rework) on the production decision were studied by Groenevelt et al. [8], Abboud [9], Lin and Gong [10], Chiu et al. [11], Chiu et al. [12], Prakash et al. [13], and Ting and Chung [14], among others. Compared with CM, PM can effectively avoid the machine breakdown. Meller and Kim [15] studied the impact of PM on system cost and optimal inventory level. Giri and Dohi [16] considered a flexible unreliable manufacturing system with random machine failure and repair time and formulated a generalized EPQ model to determine the optimal production rate and production quantity. Liao et al. [17], and Liao and Sheu [18] integrated PM into the EPQ model and considered the imperfect repair of the preventive maintenance with a random failure rate. Lee [19] studied the production and maintenance strategy for a deteriorating production system in which the products were sold with free minimal repair warranty. He developed a framework which could simultaneously determine the optimal production run length and maintenance schedule. Lin et al. [20] investigated an imperfect production system with inspection errors, preventive maintenance errors, and minimal repairs. Sana [21] considered an imperfect production system with PM for products sold with free minimal repair warranty and proposed the optimal buffer level and production run time. Widyadana and Wee [22], Wee and Widyadana [23], and Wee and Widyadana [24] developed EPQ models for deteriorating items with stochastic preventive maintenance time. Liao [25] considered a deteriorating production system with imperfect and perfect maintenance and developed an EPQ model to determine the optimal run time. Tsao [26] proposed a piecewise nonlinear optimization algorithm to solve the optimal replenishment frequencies for the production-inventory problem with maintenance, variable setup costs, and trade credits. Gan et al. [27] focused on the effects of maintenance, buffer inventory, and spare parts inventory on the minimization of the long-term expected cost rate for a production system. Emami-Mehrgani et al. [28] studied the impact of human error on repairable manufacturing systems over an infinite planning horizon. Nourelfath et al. [29] developed an optimization model for a joint production plan, the maintenance policy, and quality process in a multiperiod multiproduct capacitated lot-sizing context.

Different from the above literature, this paper proposes a generalized EPQ model under the restrictions on production run time and maintenance time over a finite planning horizon. The restrictions on production and maintenance time are embodied by the assumptions that the production run time can not exceed a maximum value once the production facility is turned on, and the maintenance time is not less than a minimum value. The production and maintenance decisions include both the production and maintenance frequencies and the production run and the maintenance time. By relaxing the constructed EPQ model and analyzing some optimal properties, this paper designs two heuristic algorithms using different techniques and compares their performance by numerical examples.

The rest of the paper is organized as follows. Section 2 describes the problem and develops a mixed integer quadratic programming model. Section 3 presents some theoretical results of the relaxation model which help to design the heuristic algorithms. Section 4 designs two heuristic algorithms to solve this problem using different techniques. Section 5 compares these two heuristic algorithms by numerical experiments. Finally, conclusions are proposed in Section 6.

2. Problem Description and Mathematical Model

2.1. Problem Description

The problem considered in this paper can be described as follows: the manufacturer needs to meet the demand of customers over a finite planning horizon in a batch production system with one production facility. In order to insure the facility against breakdown, the manufacturer performs PM to the facility. The restrictions on production and maintenance are expressed by the maximal production run time and the minimal preventive maintenance time. In other words, the production run time of each production phase can not exceed a maximal value. And the maintenance time of each preventive maintenance phase can not be less than a minimal value. The inventory levels at the beginning and the end of the planning horizon are zero. Shortages are allowed and all shortages are backlogged. The objective of this problem is to determine an effective production and maintenance policy including the production and maintenance frequencies and the production run time in order to minimize the total relevant cost composed of production, maintenance, shortages, and holding costs over the finite planning horizon.

In order to make the problem much clearer, we define some notions including production phase, production run time, maintenance phase, production cycle, and inventory cycle, which are described in Figure 1. It can be seen that the constraints on production divide the planning horizon into several production phases and maintenance phases. The production phase starts at the time when the production facility is turned on and ends at the time when the production facility is turned off. The length of each production phase is called a production run time. The maintenance phase starts at the time when the production facility is turned off and ends at the time when the production facility is turned on again. In each production phase, there are several production cycles and inventory cycles. A production cycle starts at the time when a batch is produced and ends at the time when the batch is finished. An inventory cycle is the interval between the times when the inventory level drops to zero successively. The shortage occurs when the inventory level first drops to zero until a batch is finished. Once a batch is finished, the products are transported to the warehouse, and the inventory level reaches the maximum.

2.2. Mathematical Model

The notations in Notations section are used to propose the mathematical model.

Based on the notations, we can conclude that the interval of th production cycle is and the interval of th inventory cycle is ,  . The behavior of inventory system is depicted in Figure 1. The interval of th production phase is , where ,  . In addition, letting be the shortages quantity at time , we easily have ,  ,   . Letting be the on-hand inventory level at time , we have ,   ,   . Therefore, the total shortages during th inventory cycle (denoted by ) is , and the total on-hand inventory from to during th inventory cycle (denoted by ) is ,   .

Consequently, the problem considered in this paper (denoted by ) can be formulated as

Note that the total production quantity is equal to the total demand over the planning horizon, so the variable production cost is a constant in the objective function of model . Constraint (2) represents that the production quantity of th production cycle is equal to the demand of interval . Constraint (3) represents that the production run time in th production phase can not exceed maximum value . It can be seen that must be one of the start times among the production cycles; hence with , and . Constraint (4) represents that th preventive maintenance time is not less than . Constraints (5)-(6) describe the relations among the decision variables.

It can be seen that model is a complex mixed integer quadratic programming problem where decision variables and are integers and others are continuous real values. From the aspect of the integer variables, the smallest values of and are best. However, the total cost of the production phases with the smallest and may not be the minimal one. The balance of these two aspects and the variable production run time of each production phase make the optimal solution of the model difficult to find. In order to derive an effective solution procedure, we first investigate the properties of the relaxation model in the next section.

3. Theoretical Results of the Relaxation Model

In this section, we investigate the relaxation problem of model and analyze its optimal properties which will help us design two heuristic algorithms in the following section. Ignoring constraints (3)-(4) in model , we formulate the relaxation model (denoted by ) as

It can be seen that there is only one production phase in model . Hence, we easily conclude that with in model . It means that model satisfies constraint (5). Next, we propose the optimal properties of model .

For given , we first ignore constraint (9) and reduce model to an equality-constrained problem whose Lagrange function is where , is the Lagrangian multiplier of constraint (8).

By taking the first partial derivatives of with respect to , and and setting the results to zero, we obtain

Simplifying the above equations, we obtain Since , if given , we can calculate the value of variables and successively according to (13) and (12), . Hence, we take variables and as the functions of and denote them as and . Remembering that the inventory level is zero at the end of the finite planning horizon, we need to find the value of such that .

Theorem 1. There exists unique value of such that for model .

Proof. Let ; we can obtain from (13), from (12), and from (13). Following this alternate procedure, we can obtain . On the other hand, let ; we can obtain and from (12) and (13). That is, and . So, there must exist some such that in interval . Let ; we have , which means that is a strict increasing function of . Note that and ; there exists unique () such that . Similarly, let ; we have , which means that is a strict increasing function of . Since and , there exists unique   () such that . Hence, there exists unique value of such that .

Now, we prove that the solution obtained from (12)-(13) satisfies constraint (9).

Theorem 2. The solution of (12)-(13) satisfies .

Proof. We prove this theorem by mathematical induction. For ,   can be obtained from (13) with . From (12) with , we can conclude that . Hence, holds for .
Assume that holds for ; that is, . We prove that it also holds for . When , we can conclude that from (12). For , we have from (13). According to the assumption that and the fact that , we have . Consequently, .

From the proof of Theorem 2, we can conclude the following corollary.

Corollary 3. The optimal solution of model satisfies .

Corollary 3 means that the storage time of th inventory cycle is an increasing function of .

Theorems 1 and 2 show that the optimal solution of model can be uniquely determined.

Theorem 4. The optimal solution of model satisfies ; that is, the optimal inventory cycles of model are monotonically nondecreasing function of .

Proof. From (12) and (13), we have Hence, we have for .

By applying the principle of optimality in Bellman [30], we have the following theorem.

Theorem 5. The objective function of model , , is a convex function of .

The proof of Theorem 5 can be found in Appendix.

4. Heuristic Algorithms

On the basis of the optimal properties of model , we develop two heuristic algorithms using different techniques to determine the production and maintenance policy in this section.

Let be the optimal solution of model . We can obtain the approximate solution of model by following process:(i)If satisfies the constraints on production run time and maintenance time, that is, constraints (3)-(4), then it is the feasible solution of model .(ii)Otherwise, we can obtain the approximate solution of model via the following approach:(a)Find th production cycle in which end time is the first one to exceed in the optimal solution of model and denote it by ,   . Then, the first-production phase ends at . The number of production cycles in the first-production phase is . The first-maintenance phase starts at and ends at .(b)Set the start time of th production cycle to . Recalculate the optimal solution of model in with and . Find th production cycle where is the first one to exceed and denote it by . Then, the second-production phase ends at . The number of production cycles in the second-production phase is . The second-maintenance phase starts at and ends at .(c)Keep on this process until the solution of each production phase satisfies the constraints on production run time and maintenance time. Then, the sets of the production phases and the optimal production cycles are the approximate solution of model .

Let be the index set of the first-production cycle in each production phase in the approximate solution of model obtained by the above approach and be the maximal index in . We propose the above approach as an algorithm (denoted by ).

Algorithm

Step 1. Input the values of , and . Set , , , and .

Step 2. In interval , calculate the optimal solution with . Find th production cycle of in which end time is the first one to satisfy , and let . Go to Step 3.

Step 3. If exists, record the first () production and inventory cycles in as the solution of th production phase in model . Then, let , , , , and go to Step 2. Otherwise, denote to be the solution of th production phase, stop.

The other approach to obtain the approximate solution of model is motivated by the following idea: if the length of finite planning horizon is not more than consecutive production run time , then the optimal solution of model is the optimal one of model . Otherwise, divide the finite planning horizon into several production phases with the same length except for the last one. Denote the production phases by ; then we have and when , and when . Calculate the optimal solution of model in th production phase with , , and , where represents the end time of the last inventory cycle in th production phase. Hence, the set of each production phase optimal solution is the approximate solution of model . This approach is described by heuristic Algorithm .

Algorithm

Step 0. Input the values of , , , , , , , , , and .

Step 1. Compare with . If , then the optimal solution of model is the optimal solution of model ; stop. Otherwise, set , , and , and go to Step 2.

Step 2. If , then set . Calculate the optimal solution of model with in , and denote it by .(i)If , then the optimal solution is the optimal solution of model . Stop.(ii)If there exists some such that , then resolve model with in . The total cost is the cost of new solution adding and the storage and shortage costs during . Stop.If , then the following cases are considered:(i)When , go to Step 3.(ii)When and , then calculate the optimal solution and objective value of model with in and go to Step 5.(iii)When and , then calculate the optimal solution and objective value of model with in and go to Step 5.

Step 3. Calculate the optimal solution and objective value of model with in , and go to Step 4.

Step 4. If , go to Step 5.

If , set ,   , and   , and go to Step 3.

If , calculate the optimal solution and objective value of model with in , and go to Step 5.

Step 5. Set . The solution obtained by Algorithm is the set of the optimal solutions in intervals. The total cost is the sum of cost ,   , plus .

The performance of these two heuristic algorithms is investigated in the next section.

5. Numerical Example

In this section, a numerical example is provided to illustrate the applicability and performance of the heuristic Algorithms and . The corresponding parameters are as follows: , , , , , , , , , and .

Applying Algorithms and , the optimal number of production cycles is 3 and 3, and the corresponding total cost is and , respectively. It means that there is no difference between Algorithms and for this numerical example.

In order to obtain a fair comparison between these two heuristic algorithms, we change the values of some parameters among , , and to this numerical example and keep the remaining parameters unchanged. Let be the calculation results obtained by heuristic Algorithms and , and the corresponding results are shown in Table 1.

From Table 1, we can conclude that(1)the total cost obtained by each algorithm is more sensitive to the changes of and than that of . Moreover, when , the solutions obtained by both heuristic algorithms are the optimal solution of model ;(2)when the optimal solution over the finite planning horizon satisfies the restriction on production run time, the solutions obtained by two heuristic algorithms are the same, such as cases and ;(3)when or and , the total cost obtained by heuristic Algorithm first decreases and then increases as increases;(4)the two heuristic algorithms obtain almost the same solution when the finite planning horizon is taken as the unique interval, such as case ;(5)the difference of the total cost obtained by two heuristics is at most 914 (cases and ).

To sum up, for the most part, the total cost obtained by heuristic Algorithm is not more than the one obtained by heuristic Algorithm . It means that heuristic Algorithm is superior to heuristic Algorithm . Hence, we can employ heuristic Algorithm to solve our problem.

6. Conclusions

An integrated EPQ and preventive maintenance problem under restrictions on production run time and maintenance time is proposed. Based on the assumption that the production run time can not exceed a maximum value and the preventive maintenance time can not less than a minimum value, a mixed integer quadratic programming model is built. The optimal properties of the relaxation model are investigated, and two heuristic algorithms are designed using different techniques. The numerical experiments show that, for the most part, heuristic Algorithm is more effective than heuristic Algorithm .

This paper might be extended in several ways. For example, in the model presented, we assume that the demand rate is constant. However, the models with random demand and dynamic demand are also interesting issues for further research. When there is more than one production facility in the production system, how to determine the production and maintenance decision might be another interesting issue. Finally, it might also be interesting to investigate a supply chain system and reveal the interactions of behaviors among the supply chain members.

Appendix

Proof of Theorem 5. Let be the total cost of inventory cycles in interval . The total cost of relaxation model (7)–(9) satisfies . Let be the minimal cost of inventory cycles in interval . According to the Dynamic Programming Principle, we have Let ; we have . That means that is decreasing in .
Next, we prove that is convex in . Let and be the points that satisfy . According to the Dynamic Programming Principle, we have That means that the minimal value of both and is obtained at . That is,Since , we haveUsing formula (12), bring to (A.4), and we have According to the Dynamic Programming Principle, we have Since and , we haveThe above inequality holds, since . Hence, is decreasing in ; that is, .
Now, we prove that . Hence,That means that is a convex function of . Since is linear increasing in , and is also a convex function on .

Notations

Parameters
The length of the finite planning horizon
Demand rate
Production rate,
The maximum production run time for each production phase
The minimum maintenance time for each preventive maintenance
The fixed maintenance cost and setup cost that occurred when production facility is turned on
Fixed cost that occurred when a new batch is organized to be produced
Unit production cost
Unit holding cost
Unit shortage penalty cost, . (Furthermore, we assume that the holding cost of the surplus products per unit time is less than the shortage penalty cost per unit time; that is, .)
Variables
The total number of production phases
The total number of production cycles
The start time of th production cycle, ,  
The end time of th production cycle,
The time when the inventory level drops to zero for th time, ,  .

Competing Interests

The authors declare that they have no competing interests.

Acknowledgments

This work was supported by the National Natural Science Foundation of China (Grant no. 71371107) and the Humanities and Social Sciences Research Youth Foundation of Ministry of Education of China (Grant no. 14YJCZH171).