Research Article
A Model for Sorting Activities to Be Outsourced in Civil Construction Based on ROR-UTADIS
Table 4
Standardized alternative evaluation matrix.
| Alternatives | Criteria | | | | | | | |
| Concrete | 1.0000 | 1.00 | 0.2 | 0.3333 | 1 | 0.8 | 1 | Concrete paving | 0.1750 | 0.17 | 0.25 | 1 | 1 | 0.8 | 1 | Continuous Flight Auger (CFA) Stake | 0.1750 | 0.50 | 0.08333 | 1 | 1 | 0.8 | 0.8 | Hydroseeding | 0.0275 | 0.04 | 0.5 | 1 | 1 | 0.8 | 0.4 | Earthwork | 0.4500 | 0.25 | 0.1667 | 0.2 | 1 | 0.8 | 1 | Precast concrete | 0.6750 | 0.75 | 0.5 | 0.2 | 0.8 | 0.2 | 0.8 | Transport of personnel | 0.3800 | 1.00 | 0.25 | 0.2 | 0.6 | 0.8 | 0.6 | Form system, shoring, and scaffolding | 0.0375 | 1.00 | 0.25 | 0.25 | 1 | 0.2 | 1 | Heavy equipment | 0.1000 | 1.00 | 0.1667 | 0.25 | 0.6 | 0.6 | 1 | Food supply | 0.3000 | 1.00 | 0.2 | 0.5 | 0.6 | 0.2 | 0.6 | Gypsum liner | 0.0088 | 0.06 | 0.5 | 1 | 1 | 0.2 | 0.4 | Asphalt paving | 0.0225 | 0.01 | 0.5 | 0.2 | 1 | 0.8 | 0.4 | Property security | 0.1250 | 1.00 | 0.25 | 0.2 | 0.6 | 0.2 | 0.6 | Vegetal suppression | 0.0048 | 0.04 | 0.5 | 0.2 | 1 | 0.2 | 0.8 | Containers | 0.0925 | 1.00 | 0.2 | 1 | 0.2 | 0.2 | 0.2 | Waterproofing | 0.0063 | 0.17 | 0.5 | 0.2 | 1 | 0.2 | 0.4 | Air conditioning | 0.0175 | 0.25 | 0.3333 | 0.3333 | 0.6 | 0.2 | 0.6 |
|
|