Standardized alternative evaluation matrix.

AlternativesCriteria

Concrete1.00001.000.20.333310.81
Concrete paving0.17500.170.25110.81
Continuous Flight Auger (CFA) Stake0.17500.500.08333110.80.8
Hydroseeding0.02750.040.5110.80.4
Earthwork0.45000.250.16670.210.81
Precast concrete0.67500.750.50.20.80.20.8
Transport of personnel0.38001.000.250.20.60.80.6
Form system, shoring, and scaffolding0.03751.000.250.2510.21
Heavy equipment0.10001.000.16670.250.60.61
Food supply0.30001.000.20.50.60.20.6
Gypsum liner0.00880.060.5110.20.4
Asphalt paving0.02250.010.50.210.80.4
Property security0.12501.000.250.20.60.20.6
Vegetal suppression0.00480.040.50.210.20.8
Containers0.09251.000.210.20.20.2
Waterproofing0.00630.170.50.210.20.4
Air conditioning0.01750.250.33330.33330.60.20.6