Optimizing Production Scheduling of Steel Plate Hot Rolling for Economic Load Dispatch under Time-of-Use Electricity Pricing

1Hunan Province Cooperative Innovation Center for Wind Power Equipment and Energy Conversion, College of Information Engineering, Xiangtan University, Xiangtan, China
2Department of Energy and Environmental Protection, Xiangtan Iron and Steel Corporation Ltd., Xiangtan, China

Correspondence should be addressed to Mao Tan

Received 14 November 2016; Accepted 15 February 2017; Published 7 March 2017

Academic Editor: Domenico Quagliarella

Copyright © 2017 Mao Tan et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.


Time-of-Use (TOU) electricity pricing provides an opportunity for industrial users to cut electricity costs. Although many methods for Economic Load Dispatch (ELD) under TOU pricing in continuous industrial processing have been proposed, there are still difficulties in batch-type processing, since power load units are not directly adjustable and nonlinearly depend on production planning and scheduling. In this paper, for hot rolling, a typical batch-type and energy intensive process in steel industry, a production scheduling optimization model for ELD is proposed under TOU pricing, in which the objective is to minimize electricity costs while considering penalties caused by jumps between adjacent slabs. A NSGA-II based multiobjective production scheduling algorithm is developed to obtain Pareto optimal solutions, and then TOPSIS based multicriteria decision-making is performed to recommend an optimal solution to facilitate field operation. Experimental results and analyses show that the proposed method cuts electricity costs in production, especially in case of allowance for penalty score increase in a certain range. Further analyses show that the proposed method has effect on peak load regulation of power grid.