Research Article

A One-Dimensional Hydrodynamic and Water Quality Model for a Water Transfer Project with Multihydraulic Structures

Table 1

List of hydraulic structures of study canal.

Structure (Abbreviation)SymbolNameDistance from initial section (km)

Aqueduct (Aq)Aq1Shuibeigou aqueduct32.133
Culvert (C)C1Leizixi culvert20.374
C2Leizidong culvert20.944
Diversion (D)D1Jingkeshan diversion3.697
D2Xiacheting diversion27.994
Check gate (G)G1Beiyishui check gate4.87
G2Fenzhuang River check gate19.575
Inverted siphon (INS)INS1Beiyishui inverted siphon4.39
INS2Qilizhuanggou inverted siphon10.437
INS3Matougou inverted siphon17.077
INS4Fenzhuang River inverted siphon19.352
INS5Nanjuma River inverted siphon38.348
INS6Beijuma River inverted siphon41.25
Tunnel (T)T1Xishi tunnel0.045
T2Xiacheting tunnel26.375