Research Article

Mode-Based versus Activity-Based Search for a Nonredundant Resolution of the Multimode Resource-Constrained Project Scheduling Problem

Table 3

Results obtained by using IBM ILOG CPLEX CP optimizer for solving set of the MRCPSP-ENERGY library.

Method optimalAverage time (s)Deadline
(s)

Set
 CPLEX340 (480)1800
TP-GA 0.6575218 (480)2.51