Evaluating the Efficiency of Industrialization Process in Prefabricated Residential Buildings Using a Fuzzy Multicriteria Decision-Making Method
Table 6
The ranking of PRBs by the industrialization efficiency and individual criteria.
| PRBs | PRB-A | PRB-B | PRB-C |
| Industrialization efficiency | 0.799236 | 0.681866 | 0.667371 | Rank | 1 | 2 | 3 | Standardized design | 0.787196 | 0.750471 | 0.634668 | Rank | 1 | 2 | 3 | Off-site manufacture | 0.724969 | 0.721366 | 0.777107 | Rank | 2 | 3 | 1 | On-site construction | 0.881001 | 0.695224 | 0.648796 | Rank | 1 | 2 | 3 | Component transportation | 0.714456 | 0.587474 | 0.737698 | Rank | 2 | 3 | 1 | Integrated information management | 0.767895 | 0.531846 | 0.697946 | Rank | 1 | 3 | 2 | Sustainability | 0.832773 | 0.603622 | 0.604442 | Rank | 1 | 3 | 2 |
|
|