Research Article

A Two-Stage Queue Model to Optimize Layout of Urban Drainage System considering Extreme Rainstorms

Table 7

Results after ten operations of Case (, ) with stochastic and fuzzy features.

Test number LayoutFixed costOperation costTotal cost Queue length of surface water Sojourn time in all queuesTotal time
InletsPump stationsMinMaxMeanMinMaxMean

1st6442415.3685.012500.3766.0770.3268.203426.53882.33654.43882.3
2nd6442415.3684.572499.9366.0370.3568.193422.23885.43653.83885.4
3rd6442415.3679.032494.3965.3070.1667.733347.13864.33605.73864.3
4th6442415.3677.352492.7164.0270.3767.193216.93887.53552.23887.5
5th6442415.3678.772494.1364.5270.1867.353267.63866.23566.93866.2
6th6442415.3682.612497.9766.1369.9268.023433.23837.43635.33837.4
7th6442415.3680.432495.7964.6370.1767.403278.73865.13571.93865.1
8th6442415.3679.362494.7264.6170.1667.383276.53863.73570.13863.7
9th6442415.3681.652497.0165.5670.1867.873374.23866.63620.43866.6
10th6442415.3678.422493.7864.1970.0167.103234.93847.33541.13847.3
Min6442415.3677.352492.7164.0269.9267.103216.93837.43541.13837.4
Max6442415.3685.012500.3766.1370.3768.203433.23887.53654.43887.5
Mean6442415.3680.722496.0865.1070.1867.643327.783866.63597.23866.6