Alternative Mathematical Models and Solution Approaches for Lot-Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations

1Departamento de Engenharia de Produção, Universidade Federal de São Carlos, Via Washington Luiz, km. 235, 13565-905 São Carlos, SP, Brazil
2Instituto de Ciências Matemáticas e de Computação, Universidade de São Paulo, Av. Trabalhador São-Carlense 400, 13560-970 São Carlos, SP, Brazil
3INESC-TEC e Faculdade de Engenharia, Universidade do Porto, Rua Dr. Roberto Frias s/n, Porto 4200-465, Portugal

Correspondence should be addressed to Maristela O. Santos; rb.psu.cmci@iram

Received 24 January 2017; Accepted 7 June 2017; Published 10 August 2017

Academic Editor: Gen Q. Xu

Copyright © 2017 Tamara A. Baldo et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

How to Cite this Article

Tamara A. Baldo, Reinaldo Morabito, Maristela O. Santos, and Luis Guimarães, “Alternative Mathematical Models and Solution Approaches for Lot-Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations,” Mathematical Problems in Engineering, vol. 2017, Article ID 6754970, 18 pages, 2017. https://doi.org/10.1155/2017/6754970.