Research Article
Alternative Mathematical Models and Solution Approaches for Lot-Sizing and Scheduling Problems in the Brewery Industry: Analyzing Two Different Situations
Figure 1
Difference between Cases A and B regarding the tank swaps to supply the bottling line.
(a) First period |
(b) Second period |
(c) Third period |
(d) |