Research Article

Identification of Risks and Estimation of Flood Storage in Ponds

Table 2

Pairwise matrix of the ratio of criteria to the objective and the criteria weights.

ā€‰Risk of designRisk of control planRisk of implementationEigenvector weightsConsistency ratio

Risk of design11/31/30.1400.046
Risk of control plan3120.528
Risk of implementation31/210.333