Research Article
Identification of Risks and Estimation of Flood Storage in Ponds
Table 6
Factor index and grading for the project of flood control.
| Flood control project | Factor | Lower risk | Low risk | Intermediate risk | High risk | Higher risk |
| Reservoir | Integrated risk rate | 0.00~0.25 | 0.25~0.50 | 0.50~0.75 | 0.75~0.90 | 0.90~1.00 | Flood diversion with dams | Risk degree | 0.00~0.25 | 0.25~0.50 | 0.50~0.75 | 0.75~0.90 | 0.90~1.00 | Flood area | Flood disaster risk degree | 0.00~0.25 | 0.25~0.50 | 0.50~0.75 | 0.75~0.90 | 0.90~1.00 |
|
|