Research Article

Design Analysis and Observed Performance of a Tieback Anchored Pile Wall in Sand

Figure 13

Planar graph of the excavation during different construction periods. (a) 5th excavation (−15.3 m). (b) 8th excavation (−22 m).
(a)
(b)