Research Article
Multiobjective Location Model Design Based on Government Subsidy in the Recycling of CDW
Table 4
The coordinates, construction costs, and cyclic throughput of alternative classification center.
| The center of classification | Abscissa | Ordinate | Construction cost (yuan) | Cyclic throughput (tons) |
| 1 | 76 | 12 | 86000 | 900 | 2 | 71 | 16 | 95000 | 1000 | 3 | 65 | 66 | 101000 | 1000 | 4 | 45 | 68 | 120000 | 1200 | 5 | 49 | 27 | 97000 | 900 |
|
|