Research Article

A Multiobjective Robust Scheduling Optimization Mode for Multienergy Hybrid System Integrated by Wind Power, Solar Photovoltaic Power, and Pumped Storage Power

Table 1

CGT operation parameters.

Unit type/MW/MW/MW/Yuan/hSlope of segment 1/(Yuan/MW)Slope of segment 2/(Yuan/MW)

TAURUS602.55.673204.82239273.2
CENTAUR5024.62.5136.31.5150.25307.3
CENTAUR4013.5151.8122.91136.6341.5