Research Article

A Multiobjective Robust Scheduling Optimization Mode for Multienergy Hybrid System Integrated by Wind Power, Solar Photovoltaic Power, and Pumped Storage Power

Table 4

MEHS scheduling operations results with/without PHSP.

WPP/MW⋅hPV/MW⋅hCGT/MW⋅hPHSP/MW⋅hLoad curveObjective function
Power storagePower generationPeak load/MWValley load/MWPeak- valley ratio/MW⋅h

Without PHSP135.01108.2159.200016.2210.811.5077931.89
With PHSP132.81123.1561.29−7.937.3214.1811.051.2879541.84