Plastic Zone Analysis of Deep-Buried, Noncircular Tunnel and Application on the High-Speed Railway in the Karst Area
Table 1
Physical and mechanical parameters of the surrounding rock.
Density
(kg/m
3
)
Elastic modulus
(GPa)
Poisson’s ratio
μ
Material cohesive force
(MPa)
Material frictional angle
(°)
Permeability coefficient
2550
2.1
0.25
0.2
53