Research Article

Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time

Table 1

The optimal decision of the integrated model by varying .


0.35139024.07952181.30171588.8889592.4128
0.4226028.13411976.20551454.7381521.4674
0.6426028.13411858.73831337.2708521.4674
0.7526028.13411831.83831310.3709521.4674
0.8613035.06561736.66281283.2639453.3989