Research Article

Integrated Production-Delivery Lot Sizing Model with Limited Production Capacity and Transportation Cost considering Overtime Work and Maintenance Time

Table 3

The optimal decision of the integrated model by varying .


0.01226051.08262089.15401454.7381634.4159

0.05226042.40532000.47671454.7381545.7386
0.1226028.13411976.20551454.7381521.4674
0.2226017.53281960.60421454.7381505.8661
0.4226010.49931951.07071454.7381496.3326
0.822606.11611945.43751454.7381490.6994