Research Article

Effect of Shaft Pillar Extraction on Stability of Main Shaft: A Case Study at Xincheng Gold Mine, China

Table 1

Information of the XI# ore veins.

Vein numberTonnage of ore/ktPercentage/%Distance from the shaft/m

XI-11174.5169.43%210
XI-27.840.46%129
XI-349.872.95%133
XI-475.554.47%157
XI-540.282.38%78
XI-64.960.29%65
XI-749.872.95%59
XI-8155.909.22%103
XI-9132.927.86%103

In total1691.71100.00%-