Research Article
Effect of Shaft Pillar Extraction on Stability of Main Shaft: A Case Study at Xincheng Gold Mine, China
Table 1
Information of the XI# ore veins.
| Vein number | Tonnage of ore/kt | Percentage/% | Distance from the shaft/m |
| XI-1 | 1174.51 | 69.43% | 210 | XI-2 | 7.84 | 0.46% | 129 | XI-3 | 49.87 | 2.95% | 133 | XI-4 | 75.55 | 4.47% | 157 | XI-5 | 40.28 | 2.38% | 78 | XI-6 | 4.96 | 0.29% | 65 | XI-7 | 49.87 | 2.95% | 59 | XI-8 | 155.90 | 9.22% | 103 | XI-9 | 132.92 | 7.86% | 103 |
| In total | 1691.71 | 100.00% | - |
|
|