Research Article

Scheduling Batch Processing Machine Using Max–Min Ant System Algorithm Improved by a Local Search Method

Table 3

Results of MMAS compared with CPLEX.

Problem categoryMMASCPLEX
MinMaxAvgOptimal (%)AvgTime (s)AvgTime (s)

20.0060.0036.64100.000.110.64
33.00127.0071.98100.000.100.63
43.00105.0069.13100.000.331.18
81.00198.00131.7096.000.331.42

13.0029.0020.90100.000.220.44
23.0058.0040.24100.000.220.45
28.0048.0037.97100.000.8128.04
46.0094.0071.9499.000.8226.90

27.0064.0044.12100.000.080.59
50.00124.0085.53100.000.080.58
56.00122.0087.84100.000.231.07
106.00217.00167.18100.000.231.12