Research Article
Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model
Table 2
Competitive bidding equilibrium solutions (CBEs) in the basic model.
| ||||||||||||||||||||||||||||||||||||||||||||||||
Note. The ○ sign in the liquidation column means that the project continues, whereas the × sign means that the project is liquidated. The ○ sign in the moral hazard column means that a moral hazard does not occur, whereas the × sign means that a moral hazard occurs. |