Research Article
The Improved Binary-Real Coded Shuffled Frog Leaping Algorithm for Solving Short-Term Hydropower Generation Scheduling Problem in Large Hydropower Station
Figure 3
The unit operation efficiency (UOE) of right-bank unit in Xiluodu hydropower station.