Research Article

The Improved Binary-Real Coded Shuffled Frog Leaping Algorithm for Solving Short-Term Hydropower Generation Scheduling Problem in Large Hydropower Station

Figure 8

The NHQ curve of left- and right-bank hydro units corresponding to 75m, 88m, and 107m water head.
(a) 75m
(b) 88m
(c) 107m