Research Article
The Improved Binary-Real Coded Shuffled Frog Leaping Algorithm for Solving Short-Term Hydropower Generation Scheduling Problem in Large Hydropower Station
Figure 8
The NHQ curve of left- and right-bank hydro units corresponding to 75m, 88m, and 107m water head.
(a) 75m |
(b) 88m |
(c) 107m |