The Improved Binary-Real Coded Shuffled Frog Leaping Algorithm for Solving Short-Term Hydropower Generation Scheduling Problem in Large Hydropower Station
Table 3
Stable operation region of each unit in Three Gorges corresponding to 75m, 88m, and 107m water head (Unit: MW).