The Improved Binary-Real Coded Shuffled Frog Leaping Algorithm for Solving Short-Term Hydropower Generation Scheduling Problem in Large Hydropower Station

Table 3

Stable operation region of each unit in Three Gorges corresponding to 75m, 88m, and 107m water head (Unit: MW).

Water 
head
Left-bank 
VGS units 
(1-6#)
Left-bank 
ALSTOM units 
(7-14#)
Right-bank 
ORIENT power units 
(15-18#)
Right-bank 
ALSTOM units 
(19-22#)
Right-bank 
HEC units 
(23-26#)

75m410~645435~640390~615430~665385~575
88m475~700525~700470~700500~700465~700
107m570~700615~700585~700595~700585~700