Research Article
Joint Scheduling Optimization of Virtual Power Plants and Equitable Profit Distribution Using Shapely Value Theory
Table 1
Interruptible load capacity and the maximum continuous time of the three VPPs.
VPP
IL
V1
#1, 200 Kw, 3 h; #2, 200 Kw, 1 h; #3, 150 Kw, 2 h; #4, 100 Kw, 3 h
V2
#5, 200 Kw, 1 h; #6, 250 Kw, 6 h; #7, 200 Kw, 2 h
V3
#8, 300 Kw, 3 h; #9, 100 Kw, 3 h