Research Article

Transfer Coordination for Metro Networks during the Start- or End-of-Service Period

Table 4

Running time sensitivity analysis and optimized results.

Optimized resultsThe headways: ±0 sThe headways: ±60 s
Running time: +0 sRunning time: +2 sRunning time: +5 sRunning time: +0 sRunning time: +2 sRunning time: +5 s

ATWT791 s772 s759 s735 s721 s708 s
PTFP36.6 %36.2 %35.7 %33.5 %32.5 %31.6 %
ATWT_TSP209 s189 s181 s198 s201 s203 s
Solution time108.43 s343.28 s1312.57 s306.89 s2197.54 s2879.02 s