Research Article

The Air Traffic Controller Work-Shift Scheduling Problem in Spain from a Multiobjective Perspective: A Metaheuristic and Regular Expression-Based Approach

Figure 5

Solutions of the airspace sector configuration under consideration.
(a) Initial solution
(b) Feasible solution
(c) Optimal solution
(d) Reference solution