Research Article
The Air Traffic Controller Work-Shift Scheduling Problem in Spain from a Multiobjective Perspective: A Metaheuristic and Regular Expression-Based Approach
Figure 5
Solutions of the airspace sector configuration under consideration.
(a) Initial solution |
(b) Feasible solution |
(c) Optimal solution |
(d) Reference solution |